Hamptworth Lodge | FuranFlex Case Studies

Hamptworth Lodge

Kompozit’all UK installation partner Toast had been undertaking a Chimney sweeping contract at the premises. However during this it became clear that there was an issue with the flue. After carrying out a CCTV survey inspection on each flue it was revealed that several flues were without any lining and large gaps within these flues were visible due to old age. Two flues failed the smoke evacuation test, therefore the decision was made to re-line all using RWV FuranFlex. The installation process was started at 8:00am and finished at 15:30pm. This allowed the other works on the premises to be completed on time.